We are almost there on the green garage. The 3-Form reclaimed panels are installed. Most of the railing pickets and planter railing frames are installed. We expect the siding to be delivered next week along with the garage door. The filtercrete concrete permeable paving is being poured this week as well.
And old door is being used for the entry to the storage area.
The cedar bench is almost complete. The large hole at the end will be the raised planter. Below it to the left will be the stepped lower planting beds.
Rabu, 24 Maret 2010
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar